Jebel Ali - Terminal 1 Phase 4 , Dubai

Dubai , United Arab Emirates

Location:Jebel Ali free zone.

Client: Aecom

Consultant: Aecom 

Contractor: Duttco Balfour Beatty 



Construction of 2,240 metres of quay wall, 2,240 metres of land side crane beam to accommodate 100-tonne STS cranes as well as a 440-metres long access bridge and a 2.6-kilometres causeway to link the new terminal being built on an island of reclaimed land to the main port. Included in the contract was the installation of all quay furniture, the land reclamation to create the 17 hectares of yard and access road.

 

Included in the contract was the installation of all quay furniture, the land reclamation directly behind the quay wall and the crane beam to support the ship to shore cranes. BAM International was assisted by BAM Contractors of Ireland. The works were designed by BAM’s engineering company BAM Infraconsult, URS and AECOM. For this project, BAM set up its own diving division – a fully certified team of commercial divers to run three separate diving operations 24/7.

Jebel Ali Terminal 1 , Phase 4 , Dubai
Jebel Ali Terminal 1 , Phase 4 , Dubai
© MC-Bauchemie 2024
abs 123 abs 123 abs 123 abs 123 abs 123 abs 123 abs 123