Doha Metro - Qatar Railway

Doha , Qatar

Doha Metro Phase 1 is implemented by multiple joint ventures involving local and international contractors. Qatar Rail has previously specified that consortiums looking to build different parts of the network should partner with a Qatari firm, which has led to companies such as Qatar Building Company, Galfar Al-Misnad Engineering, Al Darwish and HBContracting all picking up work alongside international bidders.



Red Line North (Underground): The Red Line North starts from Msheireb station in the South to Al Khor in the North. Seven underground stations are proposed along this route up to Doha Golf Club, from where it will be over the ground to reach Al Khor. A Joint Venture (JV) led by Italy's Salini Impregilo, South Korea's SK Engineering and Construction, and Galfar Al Misnad has been chosen as the D&B contractor.

 

Red Line North (Elevated & at-grade): A Joint Venture (JV) consortium comprising Korea's Lotte Engineering & Construction, Rizzani de Eccher of Italy and Redco of Qatar has been chosen as the D&B contractor.

 

Red Line South (Underground): The Red Line South extends from Msheireb in the North to Mesaieed in the South. It is planned to have six underground stations. The D&B JV contractors are Qatari Diar VINCI Construction (QDVC), GS Engineering and Construction, and Al Darwish Engineering.

 

Red Line South (Elevated & at-grade): The Joint Venture led by Spain's FCC and comprising Turkey's Yuksel, Netherlands' Archirodon and Qatar's Petroserv has been selected as the D&B contractor for the line. The scope of work involves full design and construction of the Red Line section along Al Wakra Highway.

 

Green Line: The Green Line, which also has both underground and Elevated and at-grade sections, extends from Msheireb in the East to Al Riffa in Doha West. The project's D&B contract of the Green line underground project has been given to a JV led by PORR Bau (UG-Lead partner), QD-Saudi Bin Laden Group (Elevated-Lead Partner) and Hamad Bin Khalid Contracting.

 

Gold Line: The Gold Line connects nine underground stations and D&B contractor is ALYSJ JV led by Greece's Ellaktor and comprising Larsen and Toubro (India), YapiMerkezi (Turkey), STFA (Turkey) and Al Jaber Engineering (Qatar).

Doha , Qatar
Doha , Qatar
© MC-Bauchemie 2024


 

 

 

abs 123 abs 123 abs 123 abs 123 abs 123 abs 123 abs 123